Rki-instruments SDM-2009 PC Controlled Configuration Manual do Utilizador Página 56

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 55
51 • Bump Testing a GX-2009
If the bump test fails and the Force Calibration box was not selected, the
following window will open indicating which channels failed the bump test.
The BUMP T LED on the SDM-2009 control panel will be solid red. Click
OK to return to the main program window or double click the instrument
information line to view the bump test results in the Logs window. The
BUMP T LED on the SDM-2009 control panel will turn off.
Figure 37: Bump Test Failed
Vista de página 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 113 114

Comentários a estes Manuais

Sem comentários