Rki-instruments SDM-2009 PC Controlled Configuration Manual do Utilizador Página 64

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 63
59 • Calibrating a GX-2009
10. After air is applied, and if all the channels passed the zero adjustment,
calibration gas will be applied. The GAS 1 indicator on the program screen will
come on. Calibration gas will be applied to the instrument(s) for 90 seconds.
Figure 44: Calibration Gas Flowing
The PC Controller Program will analyze the results.
Vista de página 63
1 2 ... 59 60 61 62 63 64 65 66 67 68 69 ... 113 114

Comentários a estes Manuais

Sem comentários